<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>jetpack</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/wathefty/public_html/jobs/wp-includes/functions.php</b> on line <b>6170</b><br />
<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>rank-math</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/wathefty/public_html/jobs/wp-includes/functions.php</b> on line <b>6170</b><br />
<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>advanced-ads</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/wathefty/public_html/jobs/wp-includes/functions.php</b> on line <b>6170</b><br />
{"id":420998,"date":"2023-04-28T12:29:46","date_gmt":"2023-04-28T09:29:46","guid":{"rendered":"https:\/\/wathefty.com\/jobs\/2023\/04\/28\/technical-advisor-small-area-estimation\/"},"modified":"2023-04-28T12:29:46","modified_gmt":"2023-04-28T09:29:46","slug":"technical-advisor-small-area-estimation","status":"publish","type":"post","link":"https:\/\/wathefty.com\/jobs\/2023\/04\/28\/technical-advisor-small-area-estimation\/","title":{"rendered":"Technical Advisor (Small Area Estimation)"},"content":{"rendered":"<p>JOB TITLE: Technical Advisor (Small Area Estimation) <br \/>TYPE OF CONTRACT: International consultant (WAE, when-actually-employed) <br \/>UNIT\/DIVISION: Food Security and Nutrition Analysis Unit, WFP Country Office Indonesia<br \/>DUTY STATION (City, Country): Remote, home-based assignment (no travel required) <br \/>DURATION: 30 working days, starting 1 June 2023 to 31 August 2023 <br \/>________________________________________<br \/>Background &amp; Context: <br \/>The demand for small area statistics has significantly increased in Indonesia. Data disaggregation for sub-national and sub-population groups (administrative areas, gender, age groups, and others) is required to support development planning, monitoring, and evaluation processes at the national level, such as the National Medium Term Development Plan (RPJMN) and Sustainable Development Goals (SDG) indicators, as well as at the sub-national level, such as the Regional Medium Term Development Plan (RPJMD) indicators.<br \/>The national statistics agency \u2013 Statistics Indonesia (BPS) \u2013 as the producer of national official statistics, aims to collect quality, up-to-date, and sustainable data, including the National Socio-Economic Survey (SUSENAS). However, as is usual for national sample surveys internationally, SUSENAS has limitations for providing reliable indicators at lower administrative levels because the direct estimation of SUSENAS-derived indicators is only feasible and reliable at the district level. To overcome the issue, BPS, particularly the Directorate of Social Welfare Statistics, has been developing small area estimation (SAE) models to improve the accuracy of direct estimations through statistical modelling. Furthermore, the SAE method has been used to generate data for the Food Security and Vulnerability Atlas (FSVA) and SDG indicators.<\/p>\n<p>To improve the reliability of the SAE methodology, World Food Programme (WFP) Indonesia, in partnership and consultation with BPS and Politeknik Statistika (STIS), engaged an international expert in 2022-2023 to review the SAE methodology for the FSVA and SDG indicators. The international consultant produced the SAE methodology review report (hereafter, \u2018SAE report\u2019), which was validated by BPS and STIS in March 2023 and is currently being translated to Bahasa Indonesian for final dissemination with BPS, STIS and other government partners, e.g., National Food Agency (NFA) and Ministry of National Development Planning \/ National Development Planning Agency (Bappenas), and other stakeholders, including fellow UN agencies and members of the UN data, monitoring, evaluation and learning (DMEL) working group. <br \/>As a next step, based on the Government request, WFP seeks to contract an additional expertise to: (a) lead and facilitate technical discussions with the Government, academia and development partners and stakeholders on the SAE report findings and recommendations; (b) develop\/design a detailed plan for the feasibility\/implementation phase of SAE (based on available data and in line with the SAE report recommendations and subsequent consultations with BPS, STIS and other stakeholders), and (c) support WFP in concept note\/proposal development for resource mobilization.<br \/>Objectives: <br \/>The overall objective of this assignment is to provide expert guidance to WFP and Government of Indonesia to conceptualize and design the SAE feasibility\/implementation phase. <\/p>\n<p>Activities, deliverables, estimated number of working days and expected timeframe<br \/>The list of activities and deliverables is provided below, together with the estimated number of working days for each activity\/deliverable and expected timeframe. At the start of the assignment the timeframe will be reviewed and updated in line with government availability and requirements.<\/p>\n<table>\n<tbody>\n<tr>\n<td>\n<p>Activity<\/p>\n<\/td>\n<td>\n<p>Deliverable<\/p>\n<\/td>\n<td>\n<p>Estimated # of working days<\/p>\n<\/td>\n<td>\n<p>Tentative Dates<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<ol>\n<li>Lead\/facilitate additional technical discussions with stakeholders* on the SAE report findings and recommendations<\/li>\n<\/ol>\n<\/td>\n<td>\n<ul>\n<li>Presentation and dissemination of the SAE report <\/li>\n<\/ul>\n<\/td>\n<td>\n<p>5<\/p>\n<\/td>\n<td>\n<p>June<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<ol>\n<li>Consultative meetings with stakeholders on the design of SAE feasibility \/ implementation phase <\/li>\n<\/ol>\n<\/td>\n<td>\n<ul>\n<li>Consultation meetings with stakeholders, e.g., BPS, STIS, Bappenas, NFA, DMEL group<\/li>\n<\/ul>\n<\/td>\n<td>\n<p>10<\/p>\n<\/td>\n<td>\n<p>June<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<ol>\n<li>Develop\/design a detailed plan for the SAE feasibility \/ implementation phase <\/li>\n<\/ol>\n<\/td>\n<td>\n<ul>\n<li>Design document for the SAE feasibility \/ implementation phase<\/li>\n<\/ul>\n<\/td>\n<td>\n<p>10<\/p>\n<\/td>\n<td>\n<p>June-July<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<ol>\n<li>Support concept note \/ proposal development for funding and resource mobilization as well as presentation to potential donors<\/li>\n<\/ol>\n<\/td>\n<td>\n<ul>\n<li>Concept note(s) or proposal(s) reviewed and\/or developed<\/li>\n<li>Presentations to potential donors <\/li>\n<\/ul>\n<\/td>\n<td>\n<p>5<\/p>\n<\/td>\n<td>\n<p>June-July<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>Total <\/p>\n<\/td>\n<td>\n<\/td>\n<td>\n<p>30<\/p>\n<\/td>\n<td>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>*Government stakeholders (NFA, Bappenas, STIS, and BPS) and development partners\/UN agencies through the Data, Management, Evaluation, and Learning (DMEL) group <\/p>\n<p>Qualification and Experience Required: <\/p>\n<p>The candidate will be selected based on the following criteria: <br \/>\u2022 A strong portfolio of previous academic research work related to the tasks outlined in this TOR<br \/>\u2022 A demonstrated theoretical and practical background in mathematics and statistics at PhD level<br \/>\u2022 At least 10 years\u2019 postgraduate professional experience in statistics and small area estimation<br \/>\u2022 Has the experience to provide research advice on small area estimation<br \/>\u2022 Has in-depth knowledge of SAE in Indonesia would be advantageous. <\/p>\n<p>Deadline of application submission: 11 May 2023. <\/p>\n<p><a href=https:\/\/router.job-listing.wfp.org\/career?career_ns=job_listing&#038;company=C0000168410P&#038;navBarLevel=JOB_SEARCH&#038;rcm_site_locale=en_GB&#038;career_job_req_id=826779>Apply For Job<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>JOB TITLE: Technical Advisor (Small Area Estimation)<br \/>\nTYPE OF CONTRACT: International consultant (WAE, when-actually-employed)<br \/>\nUNIT\/DIVISION: Food Security and Nutrition Analysis Unit, WFP Country Office Indonesia<br \/>\nDUTY STATION (City, Country): Remote, home-based assignment (no travel required)<br \/>\nDURATION: 30 working days, starting 1 June 2023 to 31 August 2023<br \/>\n________________________________________<br \/>\nBackground &amp; Context:<br \/>\nThe demand for small area statistics has significantly increased in Indonesia. Data disaggregation for sub-national and sub-population groups (administrative areas, gender, age groups, and others) is required to support development planning, monitoring, and evaluation processes at the national level, such as the National Medium Term Development Plan (RPJMN) and Sustainable Development Goals (SDG) indicators, as well as at the sub-national level, such as the Regional Medium Term Development Plan (RPJMD) indicators.<br \/>\nThe national statistics agency \u2013 Statistics Indonesi..<\/p>\n","protected":false},"author":2,"featured_media":40604,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_ti_tpc_template_sync":false,"_ti_tpc_template_id":"","spay_email":"","footnotes":""},"categories":[3,26],"tags":[],"class_list":["post-420998","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-3","category---wfp"],"jetpack_featured_media_url":"https:\/\/wathefty.com\/jobs\/wp-content\/uploads\/2022\/07\/\u0648\u0638\u0627\u0626\u0641-\u0627\u0644\u0623\u0631\u062f\u0646.png","_links":{"self":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/posts\/420998","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/comments?post=420998"}],"version-history":[{"count":0,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/posts\/420998\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/media\/40604"}],"wp:attachment":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/media?parent=420998"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/categories?post=420998"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/tags?post=420998"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}