<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>jetpack</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/wathefty/public_html/jobs/wp-includes/functions.php</b> on line <b>6170</b><br />
<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>rank-math</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/wathefty/public_html/jobs/wp-includes/functions.php</b> on line <b>6170</b><br />
<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>advanced-ads</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/wathefty/public_html/jobs/wp-includes/functions.php</b> on line <b>6170</b><br />
{"id":387583,"date":"2023-03-22T10:13:23","date_gmt":"2023-03-22T07:13:23","guid":{"rendered":"https:\/\/wathefty.com\/jobs\/2023\/03\/22\/mep-draftsman-8\/"},"modified":"2023-03-22T10:13:23","modified_gmt":"2023-03-22T07:13:23","slug":"mep-draftsman-8","status":"publish","type":"post","link":"https:\/\/wathefty.com\/jobs\/2023\/03\/22\/mep-draftsman-8\/","title":{"rendered":"MEP Draftsman"},"content":{"rendered":"<p>MEP Draftsman\t<\/p>\n<h2>\u0627\u0644\u0648\u0635\u0641 \u0627\u0644\u0648\u0638\u064a\u0641\u064a<\/h2>\n<p>1. Preparation of technical drawings based on rough sketches, specification and calculations from engineers, surveyors and architects and MEP engineers.<\/p>\n<p>2. To critically review the relevant documents prior to start of construction e.g IFC, Project Specification etc<\/p>\n<p>3. Checks and corrects work prepared by others in order to conform to standards, specifications, and design requirements<\/p>\n<p>4. Prepare finished drawings for construction work from sketches, specifications, and field notes<\/p>\n<p>5. Prepares MEP calculations for HVAC drawings, plumbing, piping and small substation and electrical works.<\/p>\n<p>6. Design change requirements, including but not limited to piping, plumbing, fire fighting design<\/p>\n<p>7. Identify any deviation in the design and provide justification for the deviation.<\/p>\n<p>8. Experience in MEP design detailing.<\/p>\n<p>9. Report to design manger as well as MEP manager for smooth coordination for design work<\/p>\n<p>11. be able to prepare quick, simple and accurate hand calculations to check the designing of others.<\/p>\n<h2>\u0627\u0644\u0645\u0647\u0627\u0631\u0627\u062a<\/h2>\n<ul>\n<li>Knowledge of MS Word, Excel &amp; Outlook, and Auto Cad is required. Knowledge of popular design software is desirable <\/li>\n<li>Minimum of 3 years chief draftsman as lead experience, design and shop drawings experience.<\/li>\n<\/ul>\n<p><\/p>\n<h2>\u062a\u0641\u0627\u0635\u064a\u0644 \u0627\u0644\u0648\u0638\u064a\u0641\u0629<\/h2>\n<dl>\n<dt>\u0645\u0646\u0637\u0642\u0629 \u0627\u0644\u0648\u0638\u064a\u0641\u0629<\/dt>\n<dd> \u062f\u0628\u064a, \u0627\u0644\u0625\u0645\u0627\u0631\u0627\u062a \u0627\u0644\u0639\u0631\u0628\u064a\u0629 \u0627\u0644\u0645\u062a\u062d\u062f\u0629 <\/dd>\n<dt>\u0642\u0637\u0627\u0639 \u0627\u0644\u0634\u0631\u0643\u0629<\/dt>\n<dd>\u0627\u0644\u0628\u0646\u0627\u0621 \u0648\u0627\u0644\u062a\u0634\u064a\u064a\u062f<\/dd>\n<dt>\u0637\u0628\u064a\u0639\u0629 \u0639\u0645\u0644 \u0627\u0644\u0634\u0631\u0643\u0629<\/dt>\n<dd>\u063a\u064a\u0631 \u0645\u062d\u062f\u062f<\/dd>\n<dt>\u0627\u0644\u062f\u0648\u0631 \u0627\u0644\u0648\u0638\u064a\u0641\u064a<\/dt>\n<dd>\u0627\u0644\u0647\u0646\u062f\u0633\u0629<\/dd>\n<dt>\u0646\u0648\u0639 \u0627\u0644\u062a\u0648\u0638\u064a\u0641<\/dt>\n<dd>\u062f\u0648\u0627\u0645 \u0643\u0627\u0645\u0644<\/dd>\n<dt>\u0627\u0644\u0631\u0627\u062a\u0628 \u0627\u0644\u0634\u0647\u0631\u064a<\/dt>\n<dd>\u063a\u064a\u0631 \u0645\u062d\u062f\u062f<\/dd>\n<dt>\u0639\u062f\u062f \u0627\u0644\u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u0634\u0627\u063a\u0631\u0629<\/dt>\n<dd>1<\/dd>\n<\/dl>\n<p><a href=https:\/\/www.bayt.com\/ar\/uae\/jobs\/mep-draftsman-4675507\/>\u0644\u0644\u062a\u0642\u062f\u0645 \u0639\u0644\u0649 \u0627\u0644\u0648\u0638\u064a\u0641\u0629<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>MEP Draftsman<br \/>\n\u0627\u0644\u0648\u0635\u0641 \u0627\u0644\u0648\u0638\u064a\u0641\u064a<\/p>\n<p>1. Preparation of technical drawings based on rough sketches, specification and calculations from engineers, surveyors and architects and MEP engineers.<br \/>\n2. To critically review the relevant documents prior to start of construction e.g IFC, Project Specification etc<br \/>\n3. Checks and corrects work prepared by others in order to conform to standards, specifications, and design requirements<br \/>\n4. Prepare finished drawings for construction work from sketches, specifications, and field notes<br \/>\n5. Prepares MEP calculations for HVAC drawings, plumbing, piping and small substation and electrical works.<br \/>\n6. Design change requirements, including but not limited to piping, plumbing, fire fighting design<br \/>\n7. Identify any deviation in the design and provide justification for the deviation.<br \/>\n8. Experience in MEP design detailing.<br \/>\n9. Report to design manger as well as MEP manager for smooth coordination for design work<br \/>\n11. be able to prepare quick, simple and accurate hand calculati..<\/p>\n","protected":false},"author":2,"featured_media":40604,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_ti_tpc_template_sync":false,"_ti_tpc_template_id":"","spay_email":"","footnotes":""},"categories":[18,33],"tags":[],"class_list":["post-387583","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-_","category-__"],"jetpack_featured_media_url":"https:\/\/wathefty.com\/jobs\/wp-content\/uploads\/2022\/07\/\u0648\u0638\u0627\u0626\u0641-\u0627\u0644\u0623\u0631\u062f\u0646.png","_links":{"self":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/posts\/387583","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/comments?post=387583"}],"version-history":[{"count":0,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/posts\/387583\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/media\/40604"}],"wp:attachment":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/media?parent=387583"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/categories?post=387583"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/tags?post=387583"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}