<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>jetpack</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/wathefty/public_html/jobs/wp-includes/functions.php</b> on line <b>6260</b><br />
<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>rank-math</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/wathefty/public_html/jobs/wp-includes/functions.php</b> on line <b>6260</b><br />
<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>advanced-ads</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/wathefty/public_html/jobs/wp-includes/functions.php</b> on line <b>6260</b><br />
{"id":323596,"date":"2023-01-17T14:34:57","date_gmt":"2023-01-17T11:34:57","guid":{"rendered":"https:\/\/wathefty.com\/jobs\/2023\/01\/17\/corporate-cost-control-manager\/"},"modified":"2023-01-17T14:34:57","modified_gmt":"2023-01-17T11:34:57","slug":"corporate-cost-control-manager","status":"publish","type":"post","link":"https:\/\/wathefty.com\/jobs\/2023\/01\/17\/corporate-cost-control-manager\/","title":{"rendered":"Corporate Cost Control Manager"},"content":{"rendered":"<p>Corporate Cost Control Manager\t<\/p>\n<h2>\u0627\u0644\u0648\u0635\u0641 \u0627\u0644\u0648\u0638\u064a\u0641\u064a<\/h2>\n<p>Responsible for establishing policies and procedures for the cost control department. <\/p>\n<p><\/p>\n<p>Establishing rules and methodologies according to the owner&#039;s requirements on cost <\/p>\n<p>reporting. <\/p>\n<p><\/p>\n<p>Responsible for the compliance and implementation of Cost Control Department-related <\/p>\n<p>policies and procedures.<\/p>\n<p><\/p>\n<p>Managing the cost control team, training them and employing more cost control staff as <\/p>\n<p>required. <\/p>\n<p><\/p>\n<p>Discussing and agreeing on the budgets for the Projects with the budgeting department <\/p>\n<p>and the Project managers. <\/p>\n<p><\/p>\n<p>Providing all necessary cost information requested to projects management to assist <\/p>\n<p>them and to share with them managing the budgets and profits. <\/p>\n<p><\/p>\n<p>Reviewing and endorsing projects expenditures incurred in line with the approved <\/p>\n<p>budgets. <\/p>\n<p><\/p>\n<p>Preparing and submitting the cost reports to the higher management on a monthly basis. <\/p>\n<p><\/p>\n<p> Presenting periodical internal Dashboard reports with discussion on Cost Report issues <\/p>\n<p>and proposing the preventive and corrective actions. In addition, taking the directives <\/p>\n<p>from the higher management presented in the dashboard. <\/p>\n<p><\/p>\n<p>Submitting consultation of the cost analysis at the Project\u2019s completion date, explaining <\/p>\n<p>the Cost Deviation Report and advising the concerned departments about the deviation <\/p>\n<p>causes and how to avoid the re-occurrence of such deviation in the upcoming projects.<\/p>\n<p>Supporting and providing historical actual cost data to the tendering department to get <\/p>\n<p>benefits of the lessons learned<\/p>\n<h2>\u0627\u0644\u0645\u0647\u0627\u0631\u0627\u062a<\/h2>\n<p>Candidate must be proficient with cost management, industry-standard estimating, project <\/p>\n<p>control software, and should be familiar with the scheduling process. <\/p>\n<p>Excellent knowledge of construction projects Cost management software and MS Office <\/p>\n<p>Software<\/p>\n<p>Bachelor\u2019s degree in Engineering, Quantity Surveying or other relevant discipline<\/p>\n<p>Minimum 15 years of Experience in Cost Control processes and management <\/p>\n<p>Experience in Large Mixed Use Projects <\/p>\n<h2>\u062a\u0641\u0627\u0635\u064a\u0644 \u0627\u0644\u0648\u0638\u064a\u0641\u0629<\/h2>\n<dl>\n<dt>\u0645\u0646\u0637\u0642\u0629 \u0627\u0644\u0648\u0638\u064a\u0641\u0629<\/dt>\n<dd> \u0627\u0644\u0631\u064a\u0627\u0636, \u0627\u0644\u0645\u0645\u0644\u0643\u0629 \u0627\u0644\u0639\u0631\u0628\u064a\u0629 \u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629 <\/dd>\n<dt>\u0642\u0637\u0627\u0639 \u0627\u0644\u0634\u0631\u0643\u0629<\/dt>\n<dd>\u0627\u0644\u0647\u0646\u062f\u0633\u0629 \u0627\u0644\u0645\u062f\u0646\u064a\u0629; \u0627\u0644\u0628\u0646\u0627\u0621 \u0648\u0627\u0644\u062a\u0634\u064a\u064a\u062f; \u0627\u0644\u0627\u0633\u062a\u0634\u0627\u0631\u0627\u062a \u0627\u0644\u0647\u0646\u062f\u0633\u064a\u0629 \u0627\u0644\u0639\u0627\u0645\u0629<\/dd>\n<dt>\u0637\u0628\u064a\u0639\u0629 \u0639\u0645\u0644 \u0627\u0644\u0634\u0631\u0643\u0629<\/dt>\n<dd>\u0635\u0627\u062d\u0628 \u0639\u0645\u0644 (\u0627\u0644\u0642\u0637\u0627\u0639 \u0627\u0644\u062e\u0627\u0635)<\/dd>\n<dt>\u0627\u0644\u062f\u0648\u0631 \u0627\u0644\u0648\u0638\u064a\u0641\u064a<\/dt>\n<dd>\u0627\u0644\u062a\u0645\u0648\u064a\u0644 \u0648\u0627\u0644\u0625\u0633\u062a\u062b\u0645\u0627\u0631<\/dd>\n<dt>\u0646\u0648\u0639 \u0627\u0644\u062a\u0648\u0638\u064a\u0641<\/dt>\n<dd>\u062f\u0648\u0627\u0645 \u0643\u0627\u0645\u0644<\/dd>\n<dt>\u0627\u0644\u0631\u0627\u062a\u0628 \u0627\u0644\u0634\u0647\u0631\u064a<\/dt>\n<dd>\u063a\u064a\u0631 \u0645\u062d\u062f\u062f<\/dd>\n<dt>\u0639\u062f\u062f \u0627\u0644\u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u0634\u0627\u063a\u0631\u0629<\/dt>\n<dd>1<\/dd>\n<\/dl>\n<h2>\u0627\u0644\u0645\u0631\u0634\u062d \u0627\u0644\u0645\u0641\u0636\u0644<\/h2>\n<dl>\n<dt> \u0627\u0644\u0645\u0633\u062a\u0648\u0649 \u0627\u0644\u0645\u0647\u0646\u064a<\/dt>\n<dd>\u0625\u062f\u0627\u0631\u0629<\/dd>\n<dt>\u0627\u0644\u062c\u0646\u0633<\/dt>\n<dd>\u0630\u0643\u0631<\/dd>\n<dt>\u0627\u0644\u0634\u0647\u0627\u062f\u0629<\/dt>\n<dd>\u0628\u0643\u0627\u0644\u0648\u0631\u064a\u0648\u0633\/ \u062f\u0628\u0644\u0648\u0645 \u0639\u0627\u0644\u064a<\/dd>\n<\/dl>\n<h2>\u0627\u0644\u062a\u0639\u0644\u064a\u0645<\/h2>\n<p>Cost Controlling, Engineering<\/p>\n<p><a href=https:\/\/www.bayt.com\/ar\/saudi-arabia\/jobs\/corporate-cost-control-manager-4655621\/>\u0644\u0644\u062a\u0642\u062f\u0645 \u0639\u0644\u0649 \u0627\u0644\u0648\u0638\u064a\u0641\u0629<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Corporate Cost Control Manager<br \/>\n\u0627\u0644\u0648\u0635\u0641 \u0627\u0644\u0648\u0638\u064a\u0641\u064a<\/p>\n<p>Responsible for establishing policies and procedures for the cost control department. <\/p>\n<p>Establishing rules and methodologies according to the owner&#039;s requirements on cost<br \/>\nreporting. <\/p>\n<p>Responsible for the compliance and implementation of Cost Control Department-related<br \/>\npolicies and procedures.<\/p>\n<p>Managing the cost control team, training them and employing more cost control staff as<br \/>\nrequired. <\/p>\n<p>Discussing and agreeing on the budgets for the Projects with the budgeting department<br \/>\nand the Project managers. <\/p>\n<p>Providing all necessary cost information requested to projects management to assist<br \/>\nthem and to share with them managing the budgets and profits. <\/p>\n<p>Reviewing and endorsing projects expenditures incurred in line with the approved<br \/>\nbudgets. <\/p>\n<p>Preparing and submitting the cost reports to the higher management on a monthly basis. <\/p>\n<p> Presenting periodical internal Dashboard reports with discussion on Cost Report issues<br \/>\nand proposing th..<\/p>\n","protected":false},"author":2,"featured_media":40604,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_ti_tpc_template_sync":false,"_ti_tpc_template_id":"","spay_email":"","footnotes":""},"categories":[19,34],"tags":[],"class_list":["post-323596","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-_","category-__"],"jetpack_featured_media_url":"https:\/\/wathefty.com\/jobs\/wp-content\/uploads\/2022\/07\/\u0648\u0638\u0627\u0626\u0641-\u0627\u0644\u0623\u0631\u062f\u0646.png","_links":{"self":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/posts\/323596","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/comments?post=323596"}],"version-history":[{"count":0,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/posts\/323596\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/media\/40604"}],"wp:attachment":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/media?parent=323596"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/categories?post=323596"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/tags?post=323596"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}