<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>jetpack</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/wathefty/public_html/jobs/wp-includes/functions.php</b> on line <b>6170</b><br />
<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>rank-math</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/wathefty/public_html/jobs/wp-includes/functions.php</b> on line <b>6170</b><br />
<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>advanced-ads</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/wathefty/public_html/jobs/wp-includes/functions.php</b> on line <b>6170</b><br />
{"id":309204,"date":"2023-01-04T17:05:39","date_gmt":"2023-01-04T14:05:39","guid":{"rendered":"https:\/\/wathefty.com\/jobs\/2023\/01\/04\/automation-engineer-5\/"},"modified":"2023-01-04T17:05:39","modified_gmt":"2023-01-04T14:05:39","slug":"automation-engineer-5","status":"publish","type":"post","link":"https:\/\/wathefty.com\/jobs\/2023\/01\/04\/automation-engineer-5\/","title":{"rendered":"Automation Engineer"},"content":{"rendered":"<p>Automation Engineer\t<\/p>\n<h2>\u0627\u0644\u0648\u0635\u0641 \u0627\u0644\u0648\u0638\u064a\u0641\u064a<\/h2>\n<p>Job Summary:<\/p>\n<p>Shall be responsible for Project Automation &amp; Instrumentation Engineering of Control Automation Systems, Safety Systems, Instrumentation, Communication Systems, related Field Cabling, etc. for Projects in various market sectors and related Designing, Product Selections, Technical Submittal Preparation, Programming, Execution, Testing &amp; Commissioning. Shall also have the basic Commercial knowledge of the Automation &amp; Instrumentation Systems.<\/p>\n<p><\/p>\n<p>Responsibilities and Duties:<\/p>\n<ul>\n<li>The candidate shall be responsible for Designing, Product Selections, Technical Submittal Preparation, Programming, Execution, Testing &amp; Commissioning of Automation, Safety Systems and Instrumentation Systems.<\/li>\n<li>Studying the RFQ documents, Specifications, Client\u2019s System Architectures, P&amp;I Drawings, Cause &amp; Effect documents, Single Line Diagrams and then selection of appropriate solution\/products required for the project implementation. <\/li>\n<li>Preparation of detailed Technical Submittals like, System Architectures, Bill of Materials Preparation, Datasheets, Specification Compliance Statements, I\/O lists, Cause &amp; Effect Diagrams, Cable Schedule, Co-ordinate with the Design\/Draughting Team to prepare appropriate GA, Wiring Diagrams, BOM required for Technical submission.<\/li>\n<li>Programming, Software Development of PLC, ESD, F&amp;G, RTU, HMI, SCADA, DCS Testing &amp; Commissioning.<\/li>\n<li>Communication Systems Designing, Product selections, Configuration, Testing &amp; Commissioning.<\/li>\n<li>Instrumentation Systems Designing, Product selections, Configuration, Testing &amp; Commissioning.<\/li>\n<li>Shall be capable of working independently and shall have good communication skills. <\/li>\n<li>Shall work with Design team to support them related to designing the Projects won by us.<\/li>\n<li>Shall be capable to do the best techno-commercial selection of automation, safety systems, instrumentation, communication system products from various reputed manufacturers.<\/li>\n<li>Shall have in-depth technical knowledge of PLC, SCADA, HMI, RTU, Safety Systems, DCS, Communication devices, Instruments, etc from various reputed product manufacturers. <\/li>\n<li>Shall have technical &amp; configuration knowledge of various Communication protocols.<\/li>\n<li>Shall have the knowledge of Oil &amp; Gas, Water \u2013 Waste Water, District Cooling, Manufacturing, Infrastructure project applications.<\/li>\n<li>Shall have the knowledge of Hazardous area classifications in the Oil &amp; Gas project applications and the Panel &amp; Instruments Ex ratings required according to Zone classifications. <\/li>\n<li>Attend techno-commercial meetings with product OEMs for most suitable product selections and for commercial negotiations.<\/li>\n<\/ul>\n<h2>\u0627\u0644\u0645\u0647\u0627\u0631\u0627\u062a<\/h2>\n<p>Requirements:<\/p>\n<p><\/p>\n<p>The candidate shall have below listed skill sets in the above listed Solutions\/Products and Market sectors \/ Project applications.<\/p>\n<p><\/p>\n<ul>\n<li>\u00b7       Programming &amp; Software Development<\/li>\n<li>\u00b7       Testing &amp; Commissioning<\/li>\n<li>\u00b7       Execution of Projects using above-mentioned Solutions &amp; Products<\/li>\n<li>\u00b7       Application Engineering knowledge<\/li>\n<li>\u00b7       In-depth Technical knowledge<\/li>\n<li>\u00b7       Most economical Solution &amp; Product selection knowledge<\/li>\n<\/ul>\n<p><\/p>\n<p>Academic and Trade Qualification:<\/p>\n<ul>\n<li>Bachelor\u2019s Degree or Diploma in Electrical \/ Electronics \/ Controls \/ Instrumentation Engineering<\/li>\n<li>Minimum experience of 4 \u2013 7 years in the relevant field<\/li>\n<\/ul>\n<p><\/p>\n<p>The candidate shall have programming &amp; commissioning experience in at least any of the two makes of Automation Systems listed below;<\/p>\n<p><\/p>\n<ul>\n<li>Honeywell ControlEdge PLC and HMI<\/li>\n<li>Siemens S7400, S71500, S71200 PLCs, HMI and WinCC SCADA<\/li>\n<li>ABB AC500 PLC and HMI<\/li>\n<li>Schneider Electric M580, M340 PLCs, HMI and SCADA<\/li>\n<li>Rockwell ControlLogix, CompactLogix PLCs and SCADA<\/li>\n<li>Emerson (GE) RX3i PLCs<\/li>\n<\/ul>\n<p><\/p>\n<p>Solutions \/ Products: Control Automation Systems, Safety Systems, Instrumentation, Communication Systems &amp; Protocols, related Field Cabling, etc<\/p>\n<p><\/p>\n<p>Market Sectors \/ Project Applications: Oil &amp; Gas, Water \u2013 Waste Water, District Cooling, Manufacturing, Infrastructure<\/p>\n<p><\/p>\n<p><\/p>\n<h2>\u062a\u0641\u0627\u0635\u064a\u0644 \u0627\u0644\u0648\u0638\u064a\u0641\u0629<\/h2>\n<dl>\n<dt>\u0645\u0646\u0637\u0642\u0629 \u0627\u0644\u0648\u0638\u064a\u0641\u0629<\/dt>\n<dd> \u062f\u0628\u064a, \u0627\u0644\u0625\u0645\u0627\u0631\u0627\u062a \u0627\u0644\u0639\u0631\u0628\u064a\u0629 \u0627\u0644\u0645\u062a\u062d\u062f\u0629 <\/dd>\n<dt>\u0642\u0637\u0627\u0639 \u0627\u0644\u0634\u0631\u0643\u0629<\/dt>\n<dd>\u0627\u0644\u0646\u0641\u0637 \u0648\u0627\u0644\u063a\u0627\u0632; \u0645\u0639\u0627\u0644\u062c\u0629 \u0627\u0644\u0645\u064a\u0627\u0647 \u0648\u0645\u064a\u0627\u0647 \u0627\u0644\u0635\u0631\u0641 \u0627\u0644\u0635\u062d\u064a<\/dd>\n<dt>\u0637\u0628\u064a\u0639\u0629 \u0639\u0645\u0644 \u0627\u0644\u0634\u0631\u0643\u0629<\/dt>\n<dd>\u0635\u0627\u062d\u0628 \u0639\u0645\u0644 (\u0627\u0644\u0642\u0637\u0627\u0639 \u0627\u0644\u062e\u0627\u0635)<\/dd>\n<dt>\u0627\u0644\u062f\u0648\u0631 \u0627\u0644\u0648\u0638\u064a\u0641\u064a<\/dt>\n<dd>\u0627\u0644\u0647\u0646\u062f\u0633\u0629 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629<\/dd>\n<dt>\u0646\u0648\u0639 \u0627\u0644\u062a\u0648\u0638\u064a\u0641<\/dt>\n<dd>\u062f\u0648\u0627\u0645 \u0643\u0627\u0645\u0644<\/dd>\n<dt>\u0627\u0644\u0631\u0627\u062a\u0628 \u0627\u0644\u0634\u0647\u0631\u064a<\/dt>\n<dd>\u063a\u064a\u0631 \u0645\u062d\u062f\u062f<\/dd>\n<dt>\u0639\u062f\u062f \u0627\u0644\u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u0634\u0627\u063a\u0631\u0629<\/dt>\n<dd>1<\/dd>\n<\/dl>\n<h2>\u0627\u0644\u0645\u0631\u0634\u062d \u0627\u0644\u0645\u0641\u0636\u0644<\/h2>\n<dl>\n<dt>\u0639\u062f\u062f \u0633\u0646\u0648\u0627\u062a \u0627\u0644\u062e\u0628\u0631\u0629<\/dt>\n<dd>\u0627\u0644\u062d\u062f \u0627\u0644\u0623\u062f\u0646\u0649: 4 \u0627\u0644\u062d\u062f \u0627\u0644\u0623\u0642\u0635\u0649: 8<\/dd>\n<dt>\u0627\u0644\u0634\u0647\u0627\u062f\u0629<\/dt>\n<dd>\u0628\u0643\u0627\u0644\u0648\u0631\u064a\u0648\u0633\/ \u062f\u0628\u0644\u0648\u0645 \u0639\u0627\u0644\u064a<\/dd>\n<\/dl>\n<p><a href=https:\/\/www.bayt.com\/ar\/uae\/jobs\/automation-engineer-4652369\/>\u0644\u0644\u062a\u0642\u062f\u0645 \u0639\u0644\u0649 \u0627\u0644\u0648\u0638\u064a\u0641\u0629<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Automation Engineer<br \/>\n\u0627\u0644\u0648\u0635\u0641 \u0627\u0644\u0648\u0638\u064a\u0641\u064a<\/p>\n<p>Job Summary:<br \/>\nShall be responsible for Project Automation &amp; Instrumentation Engineering of Control Automation Systems, Safety Systems, Instrumentation, Communication Systems, related Field Cabling, etc. for Projects in various market sectors and related Designing, Product Selections, Technical Submittal Preparation, Programming, Execution, Testing &amp; Commissioning. Shall also have the basic Commercial knowledge of the Automation &amp; Instrumentation Systems.<\/p>\n<p>Responsibilities and Duties:<br \/>\nThe candidate shall be responsible for Designing, Product Selections, Technical Submittal Preparation, Programming, Execution, Testing &amp; Commissioning of Automation, Safety Systems and Instrumentation Systems.Studying the RFQ documents, Specifications, Client\u2019s System Architectures, P&amp;I Drawings, Cause &amp; Effect documents, Single Line Diagrams and then selection of appropriate solution\/products required for the project implementation. Preparation of detailed Technical Subm..<\/p>\n","protected":false},"author":2,"featured_media":40604,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_ti_tpc_template_sync":false,"_ti_tpc_template_id":"","spay_email":"","footnotes":""},"categories":[18,33],"tags":[],"class_list":["post-309204","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-_","category-__"],"jetpack_featured_media_url":"https:\/\/wathefty.com\/jobs\/wp-content\/uploads\/2022\/07\/\u0648\u0638\u0627\u0626\u0641-\u0627\u0644\u0623\u0631\u062f\u0646.png","_links":{"self":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/posts\/309204","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/comments?post=309204"}],"version-history":[{"count":0,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/posts\/309204\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/media\/40604"}],"wp:attachment":[{"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/media?parent=309204"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/categories?post=309204"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wathefty.com\/jobs\/wp-json\/wp\/v2\/tags?post=309204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}