Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
  Planning Division - وظيفتي
وظائف في الاردنوظائف نقابة المهندسين الأردنين

  Planning Division

Planning Division

المعلن عن الوظيفة : –
نقابة المهندسين الأردنيين

تم الإعلان :- 2022-08-21

• Project planning, schedule development and maintenance.
• Initiate & Review Project Planning & Scheduling (Tender Plan, Master Plan, Client baseline, internal baseline, Subcontractors plan, recovery & revised plan).
• Review General Requirement, Milestones, Shop Drawings Schedule, Material Procurement and Delivery Schedule, Mockup Schedule, Construction Schedule, Snagging and Testing Schedule.
• Review Resource Analysis (Manpower forecast / Histograms & Actual Histograms)
• Establish and define any job oriented project control procedures and identify the level of resources required to operate them.
• Review Productivity rate & Production index Analysis.
• Review 15/30 day `look ahead’ program.
• Baseline management, resource loading and analysis, progress update and cash flow integration based on earned value methods.
• • Review of Progress reports (Daily, weekly, Monthly & Quarterly) as agreed with management.
• Review Change Order Management & Variation Orders Analysis.
• Review Extension of time Claims & Claim of Cost (Forensic Planning & Analysis
خبرة سبع سنوات فأكثر في نفس المجال

لارسال السيرة الذاتية
00962797993162
Hr.afamia2021@gmail.com

رابط الوظيفة على نقابة المهندسين الاردنيين

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

زر الذهاب إلى الأعلى