Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Senior Schedule Engineer-Process Area - وظيفتي
وظائف قطروظائف مونستر قطر

Senior Schedule Engineer-Process Area

Job Description

About this role:

  • Performs ESW project planning, scheduling, and progress measurement.
  • Reviews ESW Contractor's planning and scheduling procedures to ensure that Company's requirements are met.
  • Reviews project changes to evaluate detail schedule impact responsible for quantifying and incorporating the effect and impact of approved changes in the overall schedule for stewardship purposes.
  • Advises Head of Project Controls Head and Project Leadership Team of any potential schedule issues and when necessary, provides guidance on, corrective action and measures to mitigate any adverse trends.
  • Reviews and checks ESW Contractor's progress reports for accuracy of progress measurement. Verifies, reviews and endorses claimed progress reported by ESW Contractor.
  • Reviews and endorses schedule and progress Baselines and forecasts prepared by ESW Contractor.
  • Analyzes schedule and progress trends reported by ESW Contractor.
  • Supports PMT with ongoing project schedule and progress analysis, reporting and forecasting activities. Periodically updates Onshore Level 1 schedule to incorporate schedule updates from ESW.
  • Develops and maintains overall ESW schedule and ensures that it reflects the approved execution scope. Periodically monitors interfaces with other projects and liaises with project teams to mitigate any adverse trends.
  • Responds to ad hoc requests from PMT related to Scheduling and Reporting, including development of progress metrics, and/or key performance indicators.
  • Ensures PMT and ESW Contractor are working towards the correct priorities and schedules have clear Critical Path and Sub Critical Paths to allow for timely completion of the work.
  • Reviews productivity frequently to ensure Contractor can achieve the plan and advises when slippages are seen in Productivity Factor (PF) or Schedule Performance Index (SPI).

What you need to bring:

  • Minimum of 10 years experience in planning and scheduling in a major project environment within the oil and gas industry.
  • Experience of working with National Oil Companies or International Oil Companies will be an advantage.
  • Bachelor degree of Business or Engineering or equivalent experience

Job Details

Employment Types:

Full time

Industry:

Other

Function:

IT , Manufacturing / Engineering / R&D , Architecture / Interior Design

Roles:

Project Leader / Project Manager

للتقدم على الوظيفة اضغط هنا

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

زر الذهاب إلى الأعلى