Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Project Engineer - وظيفتي
وظائف تنقيب الاردنوظائف في الاردن

Project Engineer

Background:

Education: IT/Computer science/ Electronics or Mechatronics

Certification: certification in any of Access control, CCTV solutions is preferred.

Nationality: Only Jordanian with National ID numbers

Communications skills: must be able to articulate details in both English and Arabic, with clear understanding for the need of details

Experience: 2 years and above is preferred

Tasks and responsibilities:

Lead teams of technicians with an eye on technical tasks to be performed which include:

Onsite supervision of projects

Commissioning and setup of ELV systems

Service and maintenance of ELV systems

Driving a team of technicians

Managing your designated projects from infrastructure to project delivery

Daily reporting and final documentation of projects

Report to project manager with detailed progress reports, pending works.

Past experience in:

Past experience in core topics with history of installation and maintenance of

  • Road blockers, bollards, tire killers, turnstiles and other physical barriers
  • Intrusion systems
  • Perimeter detection systems
  • Access control
  • CCTV
  • Data Networks equipment
  • Window Server and SQL database

للتقدم على الوظيفة

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

شاهد أيضاً
إغلاق
زر الذهاب إلى الأعلى