Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Lead Estimating Engineer - وظيفتي
وظائف الكويتوظائف مونستر الكويت

Lead Estimating Engineer

Job Description

About this role:
Minimum Requirements:

  • Bachelor's Degree with minimum 15 years experience in Oil & Gas projects
  • Collect / Provide information required from market as may be necessary to complete all classes of estimates from conceptual to detailed to client requirements/ standards
  • Assist in Reviewing, verifying, and reformatting estimates as may be necessary to meet client requirements
  • Prepare required documentation and participate in the review/ finalization of bid evaluations in relation to breakdown of cost and quantities
  • Interface with other departments / Disciplines engineers in order to analyze, prepare, and finalize the cost impact of any changes/ deviations from Signed EPC Contracts, with a close Follows up and coordination for bill of quantities and firming up of final cost
  • Participate in the Development and maintaining up to date a detailed Estimating Data Bank for Labor, Material, Equipment, Consumables, and installation rates and variables as applicable to both local and international market
  • Complete any other tasks assigned to him by his line Manager as may be necessary.

Job Details

Employment Types:

Full time

Industry:

Other

Function:

IT

Roles:

Team Leader / Technical Leader

للتقدم على الوظيفة اضغط هنا

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

زر الذهاب إلى الأعلى