Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Dredging Production Engineer - وظيفتي
وظائف الأماراتوظائف بيت الامارات

Dredging Production Engineer

Dredging Production Engineer

الوصف الوظيفي

Position

  • Dredging Production Engineer

Field Industry

  • Dredging & Reclamation

Education Requirement

  • MSc / Bachelors in Civil, Coastal, Engineering or equivalent

Years of Exp. With similar position

  • 03-05

Leave

  • Annual

المهارات

Minimum requirement

  • A Dredging Production Engineer as part of the dredging performance team, analyze the dredging production and verifies implementation of set of dredging methodology on daily basis.
  • To check the estimated production with the actual dredging production and checks whether ruling/calculated limiting factors are met. If not met, verifies and analyses in depth, why these limiting factors/ productions are not met and develops plan to achieve the production estimates and limiting factors.
  • Oversees on site the actual implementation of the setup plan with the dredging superintendent and master/SDM. Prepares documentation for knowledge transfer to production department.
  • The second chapter of the function is, in cooperation with team members of the dredging performance department, search and develop production enhancing tools and innovation for onboard use on the dredging and auxiliary fleet. These exist out development of technical structures to automate repetitive tasks, incorporate and develop real time data enhancing analysis-capabilities.
  • Workout dredging methodologies to enhance the production/efficiency of the current dredging methodologies. As well as dive into overall performance to enhance innovation increase in crewing, technical and operational output.
  • Knowledge of Mat lab or similar programming language (Python, etc.)

تفاصيل الوظيفة

منطقة الوظيفة
أبو ظبي, الإمارات العربية المتحدة
قطاع الشركة
تخطيط المشاريع والبناء
طبيعة عمل الشركة
شركة توظيف
الدور الوظيفي
الهندسة
نوع التوظيف
دوام كامل
الراتب الشهري
غير محدد
عدد الوظائف الشاغرة
1

المرشح المفضل

عدد سنوات الخبرة
الحد الأدنى: 3

للتقدم على الوظيفة

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

شاهد أيضاً
إغلاق
زر الذهاب إلى الأعلى