Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Project Planning Engineer - وظيفتي
وظائف أفريقياوظائف بيت أفريقيا

Project Planning Engineer

Project Planning Engineer

الوصف الوظيفي

  1. To develop all planning and scheduling tools to be used in control, monitoring and reporting of project status.
  2. To identify scope of schedule activities.
  3. To determine milestones to support project schedule, including identification of contractual milestones.
  4. To establish activity durations and sequence for specific work disciplines.
  5. To identify inter-discipline restraints or interfaces which define activity sequences and work with the performing organizations and units to coordinate work sequences within total project plan.
  6. To develop quantity release or installation curves for a specific work discipline and review quantity logs to ensure total quantities are represented for each discipline.
  7. To assist in the development of manpower requirements for specific work disciplines and assist in resource leveling analysis to perform quantity and manpower resource loading for assigned schedules.
  8. To determine critical path activities for work areas and / or work disciplines and monitor schedule deviations and proposes corrective action/work around solutions.
  9. To identify and reports activities which have a critical or potential impact on schedule.
  10. To prepare schedule, manpower, and quantity progress and performance reports.

الوصف الوظيفي

المهارات

Power Substations Projects Experience is a must.

المهارات

تفاصيل الوظيفة

منطقة الوظيفة
مصر
قطاع الشركة
البناء والتشييد; توليد الطاقة الكهربائية
طبيعة عمل الشركة
صاحب عمل (القطاع الخاص)
الدور الوظيفي
الهندسة
نوع التوظيف
دوام كامل
الراتب الشهري
غير محدد
عدد الوظائف الشاغرة
2

تفاصيل الوظيفة

المرشح المفضل

عدد سنوات الخبرة
الحد الأدنى: 3 الحد الأقصى: 8

المرشح المفضل

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

شاهد أيضاً
إغلاق
زر الذهاب إلى الأعلى