Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ip2location-redirection domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6121 Offshore Planner - وظيفتي
ACCOUNTABILITIESThe job holder is responsible for all the scheduling, planning, progress measurement activities of the Phase 2: Batch 1, 2 & 3 and DBNPP project offshore works.
Ensure all planning requirements put in place by the contractor shall be in line with overall Project
objectives and comply with COMPANY specifications
Maintaining schedules at Project level, with analysis of critical path and potential clashes and proposal of remedial actions/solutions
Identify potential delays, analyse and issue proposed corrective actions as required
Provide planning and scheduling input for cost forecasting, for reporting purposes together with analysis of reasons for any shortfall, potential bottlenecks, mitigating actions etc, as well as for periodic presentations to all parties involved
Ensuring availability at all times of an updated and accurate scheduling and progress measurement documentation
Participate to reviews and technical audits on scheduling & progress reporting as required
Coordinating the activities related to Phase 2 and DBNPP offshore scheduling and planning and progress measurement
الوصف الوظيفي
المهارات
QUALIFICATION
Extensive experience in Project Planning and Scheduling for EPIC projects.
Experience in Offshore O&G projects.
Competence in Primavera 6.0, and MS Office Project. Competence in Primavera Risk Analysis preferred
Competence in use of MS Office applications like Excel, Word and Power Point.