Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Construction Division Manager Inlet Facilities - وظيفتي
وظائف الخليجوظائف بيت قطر

Construction Division Manager Inlet Facilities

Construction Division Manager Inlet Facilities

الوصف الوظيفي

  • The main accountabilities are:Responsible for guiding EPC Construction efforts of 5-10,000 workers during EPC construction activities at Site.
  • Responsible and accountable for all construction activities pertaining to the assigned scope of EPC works (Inlet Facilities) for the PROJECT On plot from ITT preparation/finalization, detailed engineering through construction activities at Site to hand-over to the Completion Team in accordance with the Completion Sequence.
  • First located at PMT offices for a period of about 6 months, then on Site to supervise the execution of EPC packages ensuring flawless transition with the pre-commissioning activities.
  • Reports to the PROJECT Site Manager and will have full delegation to undertake all works, activities and coordination pertaining to construction.
  • Interacts directly with counterparts at EPC Contractor on the premise that both COMPANY and EPC Contractor organizations are “mirroring”.
  • Coordinates and manages activities for assigned Area with Division/Area Project Manager(s), Engineering, Commissioning and Completion teams for key activities such as: 3D Model Reviews, Constructability and Traffic Reviews, Completion Sequence, Advanced Work Packaging.
  • Coordinates and interacts with the Head of Planning or Planning and Schedule Specialist to keep a close control on the schedule and key Project and Progress Milestones

الوصف الوظيفي

المهارات

  • More than twenty-five (25) years in Project Execution, with a strong background in fabrication, construction and management of large green field construction activities.
  • Proven experience with Advanced Work Packaging (AWP) methodology and systems completion management and associated databases.
  • Experience with multi-cultural type Projects.
  • Experience with LNG Projects.

المهارات

تفاصيل الوظيفة

منطقة الوظيفة
قطر
قطاع الشركة
وكالات التوظيف
طبيعة عمل الشركة
شركة توظيف
الدور الوظيفي
الخدمات المساندة
نوع التوظيف
دوام كامل
الراتب الشهري
غير محدد
عدد الوظائف الشاغرة
1

تفاصيل الوظيفة

Original Article

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

زر الذهاب إلى الأعلى