Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Steel Detailer - وظيفتي
وظائف السعوديةوظائف بيت السعودية

Steel Detailer

Steel Detailer

الوصف الوظيفي

Make detailed shop and fabrication drawings of steel structured automated parking units (**google images of Rotary Parking and Stacker Parking for example)

We are importing these units from various locations and intend to manufacture them locally; however, the Steel Detailer must first analyze the structures and incorporate them into a detailed shop drawing for the steel fabricators and welders to manufacture the steel structure parking units in the workshop.

Simple dimensional drawings and specifications are available in 2D AutoCAD format.

We have the steel parking structure installed and similar steel structures parking disassembled for the steel detailer to take any measurements necessary.

المهارات

1. Transfer ready-made steel parking structures to detailed plans, drawings, and other documents for manufacturing locally.

2. Perform all necessary structural calculations on the units using specialized programs to ensure that they are safe and capable of carrying the loads.

3. The capability of designing, modifying, and updating the drawings according to the needs of the clients.

4. Experience in AutoCAD and any one of the specialized steel structure calculation programs

تفاصيل الوظيفة

منطقة الوظيفة
جدة, المملكة العربية السعودية
قطاع الشركة
التصنيع
طبيعة عمل الشركة
صاحب عمل (القطاع الخاص)
نوع التوظيف
دوام كامل
الراتب الشهري
غير محدد
عدد الوظائف الشاغرة
1

للتقدم على الوظيفة

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

شاهد أيضاً
إغلاق
زر الذهاب إلى الأعلى