Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Production Engineer - Power Transformer - وظيفتي
وظائف الخليجوظائف بيت الخليج

Production Engineer – Power Transformer

Production Engineer – Power Transformer

الوصف الوظيفي

  • power transformer manufacturing process
  • read winding drawings is a must
  • core lamination cutting and stacking processes.
  • process of core & coil assembly as well as challenges posed by the same
  • vacuum type OLTC and its connection
  • the drying process in vapor phase drying plant
  • vacuum and pressurization techniques used in power transformers
  • maintain the shop floor discipline, maintain tidy assembly line and factory environment.

الوصف الوظيفي

المهارات

  • Bachelor of Engineering / BTech in Electrical Engineering
  • Experience in power transformer manufacturing industry catering to 132KV class
  • Must have thorough knowledge of power transformer manufacturing process
  • Should be well versed in the different coil winding techniques used in power transformers
  • Ability to read winding drawings is a must
  • Should be familiar with the core lamination cutting and stacking processes.
  • Should be thorough with the process of core & coil assembly as well as challenges posed by the same
  • Should Should be familiar with vacuum type OLTC and its connection
  • Should be familiar with the drying process in vapor phase drying plant
  • Knowledge of vacuum and pressurization techniques used in power transformers is a must
  • Should have knowledge in assembly procedures, safety procedures and assembly instruments and tools applicable for power transformer industry
  • Should maintain the shop floor discipline, maintain tidy assembly line and factory environment.
  • Effective verbal and written communication skills
  • Team Attitude, eager to cooperate with others
  • Knowledge of AutoCAD will be an advantage

المهارات

تفاصيل الوظيفة

منطقة الوظيفة
الكويت
قطاع الشركة
توليد الطاقة الكهربائية
طبيعة عمل الشركة
صاحب عمل (القطاع الخاص)
الدور الوظيفي
الهندسة
نوع التوظيف
دوام كامل
الراتب الشهري
غير محدد
عدد الوظائف الشاغرة
1

تفاصيل الوظيفة

المرشح المفضل

عدد سنوات الخبرة
الحد الأقصى: 7
الشهادة
بكالوريوس/ دبلوم عالي

المرشح المفضل

التعليم

Electrical Engineering

التعليم

Job Source

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

شاهد أيضاً
إغلاق
زر الذهاب إلى الأعلى