Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Project Site ODC Coordinator - وظيفتي
وظائف السعوديةوظائف بيت السعودية

Project Site ODC Coordinator

Project Site ODC Coordinator

الوصف الوظيفي

  1. Priorities and ObjectivesEnsure SAFETY at all times.
  2. Effective interaction with the Project Logistics Service Provider (LSP)
  3. Execute Logistics tasks within schedule.
  4. Comply with Logistics Operations Plan.
  5. Ensure correct workflow sequence, throughout the project. Ensure that the work is executed in accordance with the agreed integrated schedule.
  6. Maintain system for the recording and reporting of work and material and equipment movements are adhered to.
  7. Compliance with the company procedures.
  8. Ensure that HSE and QA procedures are adhered to by sub-contractors
  9. Roles and ResponsibilitySupport of respective NGH Project Site ODC Logistics related activities
  10. Liaise with the DTV based Logistics teams, Site Logistics Team and the Site Construction teams.
  11. Ensure Logistics Service Provider Compliance
  12. Attend monthly working group meetings
  13. Review ODC transport dossiers, transport drawings, stow plans, lashing designs and associated calculations.
  14. Participation in fabrication yard meetings to review loadout preparations
  15. Participation in meetings with shipowners technical representatives
  16. Participation meetings with Heavy hauliers to ensure proposed methodology is technically sound
  17. Inspect all Heavy Haulage equipment & securing materials to ensure it is fit for purpose
  18. Liaise with the Site Construction team to ensure site is ready to receive ODC cargo onto foundations and/or temporary laydown area, including availability of suitable cranes and stools
  19. Ensure ISPS compliance
  20. Liaison with Port authorities and vessel master/ship owner / vessel agent to ensure timely berthing of vessels and discharge
  21. Providing assurance to internal customers and contractors that all requirements are fully executed / fulfilled and on schedule
  22. Complying with project logistics performance targets and indicators, and subsequently maintaining records, analyzing and reporting of the respective subcontractor’s performance
  23. Coordinate with other NGHP Elements (GHE/HIDC/PWE) where activities clash or create a bottleneck at site/Port
  24. Maintain a strong HSE awareness and technical safety in Logistics. Promote safe working practice within the teams at all work sites.
  25. Provide support to subcontractors to ensure that common Logistics and contractual goals and objectives are achieved.
  26. ensure consistent application of the Air Products Logistics standards and compliance requirements across the Logistics Subcontractors
  27. Participation in investigation of Site Logistics related incidents in the execution of the project related scope
  28. Liaise compliantly and with integrity with Saudi authorities to deal with project site ODC logistics related issues
  29. Timely operational Site ODC Logistics reporting (weekly & monthly)
  30. Attend monthly progress meetings on site in NEOM when required by management.
  31. Highlight any risks to achieving timely delivery of materials and equipment.
  32. Ensure that all ODC materials & Equipment are delivered to site, ahead of the ROS date.
  33. Promote and maintain strong Teamwork and Respect with/for all parties.
  34. Maintain sound, workable inter-discipline communication and teamwork within the procurement team.
  35. Maintain a strong EPC culture within the project (appreciation and effective communication with the respective parties – Logistics, construction, projects).
  36. Ensure that the complete correct list of equipment and materials is provided for delivery planning purposes including all dimensions and weights.
  37. Ensure Logistics compliance with company IMS and procedures.
  38. Sound understanding of multi-discipline environment
  39. Support of all Project Logistics Operations Site related activities
  40. Ensure timely collection and return of stools and H Beams to Heavy Haulier by LSP
  41. Ensure Delivery notes are issued to LSP and maintain copy and register of same
  42. Coordinate deliveries with LSP
  43. Monitor and maintain SPMAT Logistics Module in regard to delivery to site.
  44. Monitor LSP’s ILMS
  45. Resolve any discrepancies with LSP, Materials Management and Construction teams
  46. Maintain a strong HSE awareness.
  47. Review daily/weekly reporting and resolve any discrepancies
  48. Prepare incident reports within required time frame for submission to & Project HSE Team
  49. Arrange Marine Warranty Discharge Surveys as instructed by Project Site ODC Lead (PSODCL)
  50. Raise Non-Conformance Reports (NCR’s) when any discrepancy is observed
  51. Liaise as deemed necessary by PSODCL with other Project functions and site to ensure that company’s goals are timely and effectively achieved
  52. Handle access permit applications for subcontractors and project staff including Site related training
  53. Maintain and update KPI register
  54. Highlight any risks to achieving timely delivery of materials and equipment to PSODCL.
  55. Establish and maintain complete correct list of equipment and materials for Transportation planning purposes including all dimensions and weights.
  56. Ensure Logistics compliance with company procedures.
  57. Any other activities as deemed necessary by Project Site ODC Lead

المهارات

Qualifications & requirements

Experience: 5 years or more

Degree: Not mandatory but desirable in related subject

Candidate requires :

  • 5 years’ experience or more working for Tier1 Project Logistics companies, EPC Contractors, Marine companies, Classification Societies mandatory
  • Degree not required but plus if in a related subject
  • Experience with capital projects mandatory
  • Experience as Supercargo a plus
  • Experience with complex Marine and Road transport operations for Super Heavy Lifts
  • Out of Gauge cargo transportation mandatory
  • Proficiency in CAD and related software
  • NEBOSH/IOSH not required but desirable
  • Fluency in English (written and spoken) mandatory

تفاصيل الوظيفة

منطقة الوظيفة
المملكة العربية السعودية
قطاع الشركة
الصناعات الثقيلة
طبيعة عمل الشركة
صاحب عمل (القطاع الخاص)
نوع التوظيف
دوام كامل
الراتب الشهري
غير محدد
عدد الوظائف الشاغرة
1

للتقدم على الوظيفة

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

زر الذهاب إلى الأعلى