Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Instrument Planner - وظيفتي
وظائف الخليجوظائف بيت قطر

Instrument Planner

Instrument Planner

الوصف الوظيفي

Key Responsibilities:

  1. Ensures planning activities is aligned to Maintenance KPIs and is executed timely for Operational effectiveness.
  1. Develop detailed scope of work for processing Company work orders for asset maintenance.
  1. Review plan tasks ensuring resources related to materials, procurement, tools, and equipment, labour, contracts and logistics requirements are allocated.
  1. Performs daily review of new notifications to ensure the information is sufficient for planning purposes and provides insight for realistic TFUC (Time Frame Under Consideration) and support the Latest Acceptable Completion Dates (LACD), amendment process checks and requests cancellation of identified duplicate work orders for similar work on the same equipment/functional location.
  1. Checks all associated costs are captured in the work order prior to sending for management approval.
  1. Raises MDG that are not listed or are incorrect in the SAP Bill of Materials (BOM) with direct relation to work order planning.
  1. Prepares Material Return to Stock (MRS) for surplus/unused materials to be returned to the warehouse.
  1. Ensures that planned works is consistent with established Company Standards.
  1. Facilitates the monthly PM review process, 12 weeks ahead of the schedule, and prepares PM plans.
  1. Maintains the library of SAP PM task lists which are set up and updates the task lists for routine and major repetitive works.
  1. Supports the work order (WO) close out process setting the status to Technical Completion (TECO).

الوصف الوظيفي

المهارات

Qualifications

  • Bachelor’s Degreee or Higher National Diploma (HND) in Engineering

Knowledge and/or Experience

  • 7 years’ experience with direct maintenance in planning /scheduling within oil and gas and petrochemical industry, out of which 3 years within Planning and/or Scheduling roles.

Technical and Business Skills

  • Proficient in written and spoken English.
  • Computer literacy and familiar with industry specific computer programs such as SAP PM.

المهارات

تفاصيل الوظيفة

منطقة الوظيفة
قطر
قطاع الشركة
وكالات التوظيف
طبيعة عمل الشركة
شركة توظيف
نوع التوظيف
دوام كامل
الراتب الشهري
غير محدد
عدد الوظائف الشاغرة
1

تفاصيل الوظيفة

المرشح المفضل

عدد سنوات الخبرة
الحد الأدنى: 7

المرشح المفضل

Original Article

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

زر الذهاب إلى الأعلى