Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Mechanical Engineer - وظيفتي
وظائف الأماراتوظائف بيت الامارات

Mechanical Engineer

Mechanical Engineer

الوصف الوظيفي

UAE National | Mechanical Engineer | AFET | UAE

What you will do

Key Accountability 1: Project Management

  • Liaise with all stakeholders (Main Contractors, Consultants, Client and internal departments) to ensure project deliverables are catered during the engineering, execution and close out of the project.
  • Coordinating with Junior Engineers and Supervisors in quantifying total material and labour requirements for the project, ensuring timely order of materials, planning/arranging of labour / sub-contractors.
  • Coordinating with Junior Engineers, and Supervisors in monitoring daily productivity, comparing with planned, taking corrective actions for loss of productivity.
  • Manage installation and construction work from time to time and ensure efficient standards of workmanship are maintained.
  • Maximise the efficient use of plant and equipment from within the organization.
  • Liaise with local authorities as required.

Key Accountability 2: Cost Management

  • Coordinating with QS to ensure that all variation works are captured, delays notified so that effective claims are made to increase budgeted project margins
  • Check for the options to propose good value engineering solutions on the designs which could mutually benefit all stakeholders, including a potential improvement to the budgeted profit margins

Key Accountability 3: ENGINEERING

  • Coordinating with engineers and drafting team for the submission/approval of shop drawings, tracking progress by shop drawing register.
  • Coordinating with engineers and procurement department for vendor finalization / material submission and approvals of suppliers / vendors / equipment, tracking progress by material submission / procurement register.
  • Seek resolution on complex technical problems as required to
  • Ensure satisfactory completion of design and construction.
  • Coordination with Electrical / other trades for verification of actual equipment loads with IFC’s, notifying changes.
  • Liaising with authorities for approvals and having up-to-date knowledge on the current regulations and standards.

Key Accountability 4: Quality / Standards

  • Apply internal engineering and construction standards, operating procedures, specifications and templates so that project delivery, engineering and construction are conducted in a consistent manner.
  • Maintaining Lessons learnt register, exchange technical information and learnings within the organization to maintain awareness of internal projects, developments and trend.
  • Develop Method Statements for each activity in line with Project Specifications.
  • Project Closeout Documentations

Key Accountability 5: Health, Safety & Environment

  • Ensuring that all company and sub contract personnel are complying with AFE HSE Policy.
  • Reporting all personal injuries and incidents and assisting with investigations.
  • Actively supporting and participate in safety and environmental initiatives.
  • Ensuring JSAs are completed as required.

المهارات

Required Skills to be successful

  • Possess sound knowledge of Mechanical engineering design and regulations.
  • Possess knowledge in project planning, project management, and cost management.
  • Possess knowledge of project development and/or project management software (i.e. AutoCAD / Revit, MS Project / Primavera).

What equips you for the role

Minimum Qualifications, Certification and Knowledge:

  • Degree in Mechanical Engineering

تفاصيل الوظيفة

منطقة الوظيفة
الإمارات العربية المتحدة
قطاع الشركة
المحاسبة
طبيعة عمل الشركة
صاحب عمل (القطاع الخاص)
الدور الوظيفي
الهندسة الميكانيكية
نوع التوظيف
دوام كامل
الراتب الشهري
غير محدد
عدد الوظائف الشاغرة
1

للتقدم على الوظيفة

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

شاهد أيضاً
إغلاق
زر الذهاب إلى الأعلى