Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Senior Planning Engineer (JO017446)  - وظيفتي
وظائف الخليجوظائف بيت قطر

Senior Planning Engineer (JO017446) 

Senior Planning Engineer (JO017446)

الوصف الوظيفي

Senior Planning Engineer
Profile Must Have :
• Engineering degree with 10-15 years’ experience in Project execution preferably in an Engineering / EPIC firm
• Proficiency in Primavera P6 and MS office tools especially MS Excel
• At least 10 years’ Experience in handling FEED and Detailed Engineering projects
• Knowledge in EPIC work processes
Main Accountabilities:
General:
• To develop a Schedule compliant with the selected execution strategy.
• To plan in order to mitigate risks and reduce costs.
• To define and optimize the necessary resources (E-P-C-I).
• To define the Planning & Scheduling system (methods, procedures, time-schedules, physical progress, dashboards, etc).
Proposal:
• To define for the Management, the Proposal Manager and the Estimation Department a Contract duration realistic and feasible for execution by Technip Energies.
Project:
• Responsible for the development, updating and maintenance of Project Planning & scheduling system (methods, procedures, time-schedules, physical progress, dashboards, etc).
• To define the Project Breakdown Structures.
• To plan to ensure the work fronts at site and timely deliveries.
• To plan in order to mitigate risks and reduce costs.
• To support Client approval process of the Schedule Baseline by providing accurate data.
• To get Client approval of progress claimed or milestones achieved in order to enable invoicing.
• To increase Project team member’s awareness of the Project Milestones, main durations and critical paths.
• To monitor and control the project status, to detect any delay and to propose corrective actions in order to mitigate risks and prevent any delay when assigned to project as and when necessary.

الوصف الوظيفي

تفاصيل الوظيفة

منطقة الوظيفة
الدوحة, قطر
قطاع الشركة
خدمات الدعم التجاري الأخرى
طبيعة عمل الشركة
غير محدد
نوع التوظيف
غير محدد
الراتب الشهري
غير محدد
عدد الوظائف الشاغرة
غير محدد

تفاصيل الوظيفة

Original Article

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

زر الذهاب إلى الأعلى