Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Cost Engineer - وظيفتي
وظائف الأماراتوظائف بيت الامارات

Cost Engineer

Cost Engineer

الوصف الوظيفي

  • Establish and manage a cost control system in order to support the PM decision-making process and allow him to complete
  • the project within the approved budget
  • Ensure any deviation from budget is promptly spotted and analyzed, final impact is estimated and the effect of corrective
  • actions taken is monitored
  • Create a cost awareness atmosphere among project team
  • Satisfy the Operating Company and Corporate requirements for the cost control reporting, cooperating with the proper interfacesAt project initial phase:
  • After contract award, ensure the implementation of the Cost Control System, elaborating the consolidated Cost Breakdown
  • Structure according to the relevant procedure, reviewing the procurement/accountin g system adopted in each Operating
  • Companies/Branches involved into the project, and verifying the application of the CBS and the cost traceability
  • Issue the Project Cost Control Procedure, Cost Coding Manual and Risk Managemen t Plan, for the Project Control
  • Manager verification, according to standards and contract specification and configure the Cost Breakdown Structure to
  • monitor procurement and accounting activities
  • If not provided during the commercial phase, split the Commercial Budget according to the intercompany scheme, contract
  • and work schedule, in order to report revenues/costs by entity, currencies, and main cost accounts and prepare the cash-flow by currency

المهارات

  • Coordinate the risk managment activities startup organizing the first brainstorming and the qualitative / quantitative
  • assessment of the identified risks and opportunities
  • Carry out the Montecarlo Analysis
  • During the project execution phase:
  • ensure the Cost Control System works effectively and cost status is soundly assessed and reported
  • monitor activity progress and the relevant earned value, as well as the value of work done against the invoices received,
  • determining the monthly accruals (to have accounts in line with works progress)
  • Support the Project during the contract changes/claims process providing the cost impact analysis, and keep updated the
  • cost/revenues forecast relevant to intercompany services
  • Analyse committed costs and activities to-date, review the estimate to complete, isolating any deviation from bas elines or
  • adverse trend and warn the PM on time to take corrective actions in order to prevent overruns
  • Maintain the risk management process organizing periodic meetings and verifying the risk owners feedback
  • Issue the project and company reporting
  • At project closure
  • Support the Project Control Manager in the preparation of the Project close-out Report and the costfeed-back data to
  • Project Control and Commercial Departments

تفاصيل الوظيفة

منطقة الوظيفة
أبو ظبي, الإمارات العربية المتحدة
قطاع الشركة
النفط والغاز; النفط والغاز
طبيعة عمل الشركة
شركة توظيف
الدور الوظيفي
الهندسة
نوع التوظيف
دوام كامل
الراتب الشهري
غير محدد
عدد الوظائف الشاغرة
3

المرشح المفضل

المستوى المهني
إدارة
عدد سنوات الخبرة
الحد الأدنى: 10 الحد الأقصى: 20
الجنسية
إندونيسيا; الفلبين; ماليزيا
الشهادة
بكالوريوس/ دبلوم عالي

للتقدم على الوظيفة

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

زر الذهاب إلى الأعلى