Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
NEOM HELIOS Project Manager - وظيفتي
وظائف السعوديةوظائف بيت السعودية

NEOM HELIOS Project Manager

NEOM HELIOS Project Manager

الوصف الوظيفي

NEOM HELIOS Project Manager – Marine Facilities

PRINCIPAL ACCOUNTABILITIES

  • During project development, align strategies for execution, procurement, construction, and start-up with the overall strategy of NEOM Helios. The project scope includes engineering, design, procurement, construction, plant commissioning and start-up, etc.
  • Oversight and direction of all project execution activities, including overall cost, schedule, quality, and plant performance associated with the project assigned.
  • Overall management of all aspects of the project performed by Air Products, including work done within Global Engineering and Manufacturing and Procurement.
  • Perform Hold Point Checks (determine measures to be taken against risks, HSE requirements and savings potential) and Design and HSE Reviews and check and release essential documents for the next project phase (phase achievement).
  • Develop and lead a high-performing project team that includes the core Air Products’ project members, other Air Products functions, external partners, vendors, equipment vendors, and possibly, customer representatives. Motivate the team members involved in the project to complete performance.
  • Accountability for review of unique execution strategies and decision-making processes to address these situations. Lead the internal and/or external problem-solving necessary to arrive at appropriate decisions.
  • Monitor engineering, HSE, Quality, and project progress, paying attention to the coordination of expense and effort,
  • Coach and develop less experienced project team members to develop skills and knowledge—subject matter expert on package unit management.
  • Maintain a safe work environment and support corporate and organizational safety goals in the office, with suppliers, and at fabrication and field sites.
  • Ensure Risk Management procedures are followed, and any issues addressed/resolved.
  • Compile project reports and the final project report.

المهارات

NEOM HELIOS Project Manager – Marine Facilities

تفاصيل الوظيفة

منطقة الوظيفة
ضبا, المملكة العربية السعودية
قطاع الشركة
الصناعات الثقيلة
طبيعة عمل الشركة
صاحب عمل (القطاع الخاص)
نوع التوظيف
دوام كامل
الراتب الشهري
غير محدد
عدد الوظائف الشاغرة
1

للتقدم على الوظيفة

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

شاهد أيضاً
إغلاق
زر الذهاب إلى الأعلى