Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
  Cost Control Division - وظيفتي
وظائف في الاردنوظائف نقابة المهندسين الأردنين

  Cost Control Division

Cost Control Division

المعلن عن الوظيفة : –
نقابة المهندسين الأردنيين

تم الإعلان :- 2022-08-21

Establish and communicate cost and schedule baselines and ensure control mechanisms are in place to monitor performance.
• Ensure that all cost, planning and document control reports are prepared and issued in accordance with Project Coordination Procedures.
• Liaise with other Departments at all meetings relevant to project operations and ensure time and cost plans are updated to reflect latest information.
• Review Cash Flow Analysis: selling price, Cost (cash in and cash out and margin profit) &Cash Flow Curves.
• Review project budget & Earned Value Analysis: SPI, CPI, SV, CV, ETC, EAC, VAC and TCPI.
لارسال السيرة الذاتية
00962797993162
Hr.afamia2021@gmail.com