Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Planning Manager - وظيفتي
وظائف السعوديةوظائف مونستر السعودية

Planning Manager

Job Description

Job Description
Job Title: Planning Manager
Responsibilities

  • Assist in the implementation of the Project Execution Plan
  • Assist in the preparation and management of overview and strategic programmes, including design, procurement and construction schedules together with supporting information required schedules
  • Coordinate and manage the preparation and development of target construction and procurement schedules together with associated information required schedules
  • Establish and agree project reporting procedures, prepare and present monthly project progress
  • Review the schedules and related documents from the contractor including monthly reports and analyse the content to ensure compliance with project objectives
  • Review schedule trends to identify problem areas and recommend corrective action to management. Monitor actual progress against planned progress
  • Monitor engineering design progress, material and equipment procurement and construction and commissioning status
  • Prepare progress monitoring tools for the management and monitoring of the above mentioned schedules. Monitor progress both on and off site. Identify deviations (progress trends) in both construction and procurement progress and suggest possible courses of corrective action
  • Working closely with the Planning Manager and Project Team to ensure that the contract programme is feasible, complies with the Project Master Plan and contractual documents
  • Interface on a daily basis with the main contractor sub contractors and internal management.
  • Carry out studies into scheduling, manning and material flow as needed
  • Attend offsite meetings as requested by the client
  • Review schedules for slippage of key dates
  • Assist in the defence / approval of any claim for time extension or major change to the schedule
  • Other duties as requested from time to time
  • Ensuring that each Scheduling Engineer runs his or her section to the highest professional standards, that all information is current, and that every member of the team is receiving the information he or she needs to fulfil their responsibilities.
  • Establish and maintain consistent and adequate administration procedures, in their field. These procedures will be followed across the project by the respective planners working under the Construction Managers.
  • Participate with the project management team, as directed by the Project Director, to achieve project deliverables.
  • Issue high-level schedule weekly updates
  • Identify and report main issues interfering with progress
  • Identify and report on measures for improving schedule performance
  • Coordinate with Planning Managers on all aspects of the work
  • Provide all time related information to the Scheduling Manager
  • Follow the procedures, tools, templates, instruction, etc. issued by the Scheduling Manager.
  • Monitor the timing of submittals against schedule requirements
  • Assist in the preparation and management of overview and strategic programmes, including design, procurement and construction schedules together with supporting information required schedules

You will be a recognised expert with a minimum of 10 years experience as a Senior Planner/Scheduler / Planning Engineer

  • You willhave considerable planning experience showing clear career progression in the planning field through working either client side or for a consultancy
  • Successful applicants will have experience of working on high value, high rise and other building projects ideally coupled with an excellent overall understanding of the Aviation industry
  • Proficiency in the use of Primavera (P3/P5/P6) and MS Project is also essential
  • Strong verbal and written communication skills is essential
  • The successful planning engineer will be responsible for project planning in one of the following areas:
    • Hotels
    • Multi storey Residential / Commercial Buildings
    • Large Mixed Use developments
  • We offer an excellent package which includes:

    • A competitive salary
    • Accommodation allowance
    • Transportation allowance
    • 22 calendar days annual leave
    • Medical and life insurance cover
    • Company gratuity scheme
    • Discretionary bonus scheme
    • Annual flight allowance to point of origin

    Job Details

    Employment Types:

    Full time

    Industry:

    Engineering / Procurement / Construction

    Function:

    Advertising / Entertainment / Media

    للتقدم على الوظيفة اضغط هنا

    مقالات ذات صلة

    اترك تعليقاً

    لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

    زر الذهاب إلى الأعلى