Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the advanced-ads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wathefty/public_html/jobs/wp-includes/functions.php on line 6114
Construction Superintendent Piping / Testing (Night Shift) - وظيفتي
وظائف قطروظائف مونستر قطر

Construction Superintendent Piping / Testing (Night Shift)

Job Description

Job Description – Construction Superintendent #1 Piping / Testing (Night Shift)
Job Purpose

  • The position is responsible and accountable for all Night Shift piping fabrication, installation, and testing activities pertaining to the scope of EPC-1 at RLIC Site through hand-over to the Commissioning and Completion Teams in accordance with the Completion Sequence.
  • This position is located at RLIC Site to supervise the execution of the fabrication and construction works, ensuring compliance with the approved construction sequence and a seamless transition with the pre-commissioning, then commissioning activities.
  • The position shall interact daily with its counterpart at EPC-1 Contractor on the premise that both COMPANY and EPC-1 Contractor have mirror organizations.
  • The position includes the review, comment and approval of construction related deliverables submitted by the EPC-1 Contractor.

Job Context & Major Challenge(s)

  • Large, one of a kind, complex LNG Project with large construction scope, quantities and direct man-hours involved.
  • Start with end in mind Project, with the necessity to achieve a smooth and flawless construction execution and transfer to the commissioning team to secure first drop LNG from LNG Trains 8, 9, 10 and 11 Hand-Over at Effective Date plus 57, 63, 69 and 75 months.
  • Be inventive on construction execution and methods, bring experience from other large and complex projects, in particular LNG Plants.

Person Specification – Minimum Requirements

  • Technical background as a discipline engineer, Project Engineer, Field Engineer, or Construction Superintendent, Construction Manager with solid Project Execution experience
  • More than fifeteen (15) years in Project Execution, with a strong background in fabrication, construction and management of large green field construction activities.
  • Proven experience with Advanced Work Packaging (AWP) methodology and systems completion management
  • Experience with multi-cultural type Projects.
  • Experience with LNG Projects
  • Good organizational, planning, communication, and execution skills
  • Computer literacy (MS Office, SAP)

Job Details

Employment Types:

Full time

Industry:

Banking / Accounting / Financial Services

Function:

Construction

Roles:

Other Roles

للتقدم على الوظيفة اضغط هنا

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

زر الذهاب إلى الأعلى